Language becomes matter.
The first system that takes a sentence and returns a finished, working product. Quantity one.
1Minimum order
3–4 wksSentence to shipped
$0Tooling
Pick a sentence. Watch it form.
Resolved
Sampled from the shipped geometry
Choose a prompt
- Object
- Dragon candle holder
- Material
- 316L stainless
- Lead
- 3–4 weeks
- Unit at qty 1
- $189
Real figures. All three have been manufactured.
Three numbers made one-offs impossible.
01Tooling before unit one$50,000was $50,000
02Minimum order quantity5,000was 5,000
03Electronics programme12was 12 months
Software promises. Steel delivers.
1976Machining on this floor since
32Materials in production
±0.05Millimetres achievable
Tell us what to build.
- Reply
- Two working days
- You speak to
- A manufacturing engineer
- First run
- Quantity one is fine
- Direct
- founders@fabriark.com
